SEPPES High Speed Clean Room Doors for Pfizer

High Speed Clean Room Doors for a Pfizer Pharmaceutical Facility

SEPPES configured high speed clean room doors for a Pfizer cleanroom operating at a reported 30 Pa pressure differential. Limited installation space required a compact head box and guide profile, while the access sequence required interlocking with an adjacent steel swing door.

The stainless steel clean room doors project-specific configuration combined a 1.2 mm PVC curtain, SUS304 frame, SUS304 control box and conduit, touchless opening, forced override control, backup power, and stainless steel closure plates around the head box. Together, these elements created a cleanly finished, controlled entrance suited to the site’s airlock arrangement.

Project Snapshot

Project item Confirmed detail
Customer Pfizer
Application Pharmaceutical cleanroom airlock
Reported pressure condition 30 Pa differential pressure
Door type Cleanroom-dedicated high speed zipper door
Curtain 1.2 mm PVC with vision window and yellow edging
Exposed structure SUS304 frame, control box, and electrical conduit
Access logic Interlock with adjacent steel swing door
Activation Touchless switch
Additional controls Forced override and backup power

Why a Compact Cleanroom Door Was Required?

The reserved area around the opening offered limited head and side space. A conventional clean room roll up door would have required a larger head box and guide arrangement. SEPPES therefore used a cleanroom-dedicated version with a smaller enclosure and more compact zipper-track profile.

Reducing the profile also limited broad exposed surfaces where dust could collect. Stainless steel sheets closed the remaining gaps around the head assembly, helping create a more complete interface between the installed door and surrounding cleanroom finish.

The European Commission’s EU GMP Annex 1 publication provides wider guidance on contamination control and airlocks in sterile manufacturing. The installed door alone does not establish cleanroom classification or compliance; those outcomes depend on the facility design, HVAC balance, validation, procedures, cleaning, and operation.

High Speed Clean Room Doors and Pressure Control

The automatic clean room doors​ formed part of a boundary operating under a reported 30 Pa pressure differential. Its curtain, zipper guides, perimeter finishing, and opening time all influence how the doorway interacts with room airflow.

However, a door does not generate or independently maintain room pressure. Actual performance depends on supply and extract airflow, leakage paths, adjacent doors, opening frequency, seal condition, wall interfaces, and commissioning of the complete room.

For a new project, the pressure cascade, intended airflow direction, door opening duration, recovery time, and failure response must be reviewed with the cleanroom designer.

Clean Room Door Interlock System

Normal Airlock Sequence

A non-contact switch lets personnel request door opening without touching a push-button surface. This removes one routine contact point, but it does not replac

Forced Override

An authorized forced-open rotary switch can release the interlock when the site’s approved safety procedure requires access. Its permissions, alarms, reset process, and event recording should be defined in the final controls document.

Backup Power

Backup power was included so the high speed clean room doors can follow the site’s defined response during a power interruption. Required operating time and the safe door position must be confirmed during engineering and commissioning.

Project-Specific Cleanroom Configuration

Selection point Pfizer project configuration Why it mattered
Installation space Compact head box and smaller zipper guide Fit the reserved opening zone
Pressure condition Configured around a reported 30 Pa differential Supported the engineered cleanroom boundary
Exposed materials SUS304 frame, control box, and conduit Matched the specified cleanroom finish
Access control Steel-door interlock and touchless switch Supported controlled, lower-contact movement
Emergency access Authorized forced override Provided a defined method to release normal interlocking
Power interruption Backup power Supported the site's planned response
Perimeter finishing Stainless closure plates around the head box Reduced unfinished gaps around the installation

The project also reserved a track wiring entry at 1400 mm above the finished floor and supplied 3 m of stainless steel conduit per door. These are installation details from this project, not universal dimensions for every cleanroom door.

댓글 남기기

이메일 주소는 공개되지 않습니다. 필수 필드는 *로 표시됩니다

Subscribe to Our Newsletter

Inter pouere erat a ante veatis dapi posre velit aliquet sites.

Post Tags

Related Posts

Keep Exploring

Discover more articles that dive deeper into solar insights, innovation, and success stories.

위로 스크롤